The Group has been awarded the US$3.8 billion construction of new electrified double-tracks to replace the current single track on the West Coast railway line in Malaysia. The total length of the Double-Tracking rail project is 635km.

A major section comprising 4km of the Kaohsiung Metropolitan MRT Orange Line in Taiwan, as well as two underground stations is being constructed by Gamuda in a joint venture with New Asia, Taiwan.

 

 
© Copyright Protected. Gamuda Bhd. Powered by Three Sixty Technologies