New Doha
International Airport (NDIA), Qatar
Gamuda, in a joint venture with Sinohydro Corporation
and WCT Engineering Berhad, has been awarded
a US$490 million contract on 18 July 2005 to
design and build airfield facilities, road tunnel
and detention ponds for the New Doha International
Airport (NDIA).
The contract covers design detailing, procurement,
construction, start-up and commissioning of
airfield facilities, including two runways of
4.84km and 4.25km respectively, three full-length
parallel taxiways, all airfield lighting and
electrical substation equipment, a 1km dual
3 lanes tunnel providing access to the airfield
area and a detention ponds system to manage
airfield drainage.
|