Western
Kuala Lumpur Traffic Dispersal Scheme
(SPRINT), Malaysia |
| |
| Fact Sheet |
|
|
Client
|
Government of Malaysia |
Concessionaire
|
Sistem Penyuraian Trafik KL Barat Sdn Bhd |
| Turnkey Contractor |
Gamuda – Mujur Minat Joint Venture |
Scope of Works |
- Design
- Supervision
- Construction
- Commissioning |
Construction Cost
|
US$200 million |
Project Facts
|
| Links: |
|
Length:
|
26km
|
Carriageway Width:
|
3.5m/lane |
Number of Lanes: |
6 |
Interchanges:
|
13 |
Bridges:
|
16 |
Viaduct:
|
2km (3.5m/lane)
|
Tunnel: |
710m twin-bore tunnel
|
Vehicular Underpass: |
1 |
Pedestrian Bridges:
|
9 |
| Toll Plazas: |
3 |
| Toll Booths: |
74 |
Tunnel Features:
|
-
Clearance envelope 10.5m (w) x 5.4m
(h)
-
3 lanes carriageway per tunnel bound
-
CCTVs
-
Smart lighting system
-
Waterproofing membrane
-
Epoxy coated tunnel lining
|
|
|
|
|
|